Mississippi Gulf Fishing Banks, Inc.
Activity Report for the Period
March 9, 2001 - April 12, 2001
Trip Summary
During this period, one trip was made on April 10 to deploy limestone off the Pascagoula Beach Pier. There were
plans to deploy more rock at Long Beach and Ulman Piers on April 12, but that trip was aborted due to high winds.
Pascagoula Beach Pier Limestone
On April 10, T&W Marine and PRIMOFISH.COM met at the Pascagoula Beach Pier to deploy limestone within
coordinates provided by the Mississippi Department of Marine Resources. The coordinates provided were 30°20.428
/88°32.059, 30°20.428/88°32.019, 30°20.394/88°32.019, 30°20.394/88°32.059. Most of the material was centered
around 30°20.423/88°32.040, 12454.4/47103.5/29688.5. The surrounding water depth was 4'-6' with a minimum
clearance of 3 feet. Readings were taken at about 1030 AM. The tide level was about 1.4 feet at the time with a
range that day of 1.8' (-.2' to +1.6') and high tide occurring at 1118 AM. Approximately 200 cubic yards was
deployed.